Saturday, October 31, 2015
Copy Paste from Wordpress
I just finished copying and pasting here my blogs from Wordpress. Until now, I am contemplating on which platform to continue. Do I have to use Blogger often and ditch my wordpress blog? Though I cant decide on this yet, what matters is I pursue my blogging to document the lessons I learned throughout my career and of course on how I can apply this to my daily life journey..
Earthquake Preparedness: Engineer's Thoughts
With the recent Nepal earthquake, our national government in the Philippines through PHIVOLCS just issued again the VFS(Valley Fault System) Map for information dissemination. This time it captured lots of Filipinos awareness and became a trending topic in social media. My wife who used to ignore my stories about the fault line (me being a structural engineer) immediately threatened me after hearing the news(weird lol).
Social media suddenly became a bulletin board full of prayers for the Philippines. I hope we begin to think realistically and do not just rely too much on Faith alone. This may not be the perfect suggestions, but here are my thoughts:
- Luckily, most high rise building in the metro are designed according to NSCP (the national structural code of the Philippines). Thus, no immediate worries of possible distraction when earthquake comes. However, some were not designed according to the latest Code which considers ductility of the frame.
- Although these buildings may withstand extreme earthquake, the other scenario which may result due to this earthquake is what matters most:
- Access to food, electricity and clean water will be hard because such magnitude of earthquake may divide roads and detroy electric posts and can even caused fires.
- Our municipality in valenzuela recently launched its 3S centers in times of disasters like this. Other cities especially those lying near the valley fault system should follow the same. Again, careful planning from the urban planners usually architect and in coordination with engineers should drive this endeavour.
- Now as individual family effort, we should at least have a week storage of food or other source of electricity in our house say a generator. Although you need to make effort storing diesel fuel for that. Basically, the way we prepared for typhoons is also the same with earthquake preparedness but for this case instead of rainfall as our enemy, it’s the destruction of our house debris falling down on us.
- Just my thought, I have been fond of correlating earthquake occurrence with the moon rotation. Most sites said that large earthquakes occurred during full moon window. We may observe that large storm also usually occurs after a large earthquake. In short, we cant help but wander that there are external forces linked to this events.
- Now, if you are afraid your house will be destroyed for such event, please consider consulting a structural engineer before you build house in order to ensure your house will sustain such devastating force from mother nature.
..I will think further on some preparation for this large event..
Discipline, Discipline, Discipline
As i sat down on my chair to start my day's work, I remember what I read yesterday about discipline at work. It said not to concentrate on your computer for an hour before doing any work and an hour before leaving the work in the afternoon. I guess it really is helpful. I avoided the temptation of clicking on lots of email correspondence and internet sites which normally take our concentration away from the urgent matters to handle.
Now, going back to urgent matter. It has been a disciplined habit to write down all urgent tasks for the day and even write down previous urgent task yesterday which I was not able to performed. And guess what? It was a long list of item again!
My approach here is proven correct and tested. After writing down the lists, I will create dotted points beside those urgent items to separate the most urgent matters at hand. This easier said than done. You need to check if your urgent taks is really the urgent one. That needs coordination with your immediate boss and you should do this early in the morning as stated here.
After that, work your way on those pressing items and think with this phrase " Begin with the End in mind"..Think of the final result of this task and step by step determine how you can accomplish the task in timely manner..
I have been doing this exercise of discipline since I started working and it really helps..
Random Lessons Learnt in Construction
As we progress on construction for a project, lots of incompetency arises that were not brought into light during bid evaluation of the winning constructor. I guess, as a designer, we should check first their capacity, their pool of manpowers and their skills to verify if later on during construction they will comply to designers expectation. However, also as a designer, and we dont have the minds of the client choosing the winner, we should be well prepared to handle those challenging tasks of pleasing the client while the constructor causes delay by not following proper procedure as dictated by designer. Thats where the good Project Manager comes in.
Thankfully, I had lots of guidance from more senior engineer to handle such task prioritizing everything during construction.
For younger engineers, its really helpful to be employed in a company with established standards and will help you be more organized with decision making. For example, submittals like construction materials will require certain ASTM standards for compliance which is usually stated in the specifications. Having skills sets of knowing what to ask from the contractor and how to ask it with conviction, is really a great confidence builder as designer and checker.
Excel Addict
I saw this book titled Microsoft Excel Addict..I guess this can be a good way to start becoming a good excel user. being an engineer, you should be good at using spreadsheet like excel.
Tips on Checking Steel Structure Shopdrawing
Will be checking steel fabrication shopdrawing. Not having such experience before, I opted to ask my supervisor how it shall be done. At the back of my mind, using logic and common sense, every shopdrawings for structural must all be dependent on architectural drawings. Luckily, I was right again.
The drawings indicated T.O.S (Top of Steel) elevation. It striked me that such values in the drawing requires architectural confirmation of elevation. But how is it confirmed? I guess the thickness of roofing and also type of purlins used shall be determined. However, the construction moves where contractor proposes lots of alternatives to saves money. And this, ideally, must be captured also in the shopdrawing. But it will be too late to ask for the final drawings. Thus, a proper disclaimer I guess shall cover the designer of possible changes in the construction. Construction manager on site must inform the designer immediately of those changes.
The least that structural engineer must do in the shopdrawing is to check the sizes indicated in the shopdrawing against the approved schedule and plan. And the connection of the framing must be followed.
Fortunately, I have dual monitors used in the office. I would open the shopdrawing PDF in the other monitor while the CAD drawing of our For Construction Drawings in the other. Reviewing side by side the two drawings is easier.
For a very complicated drawing, I would print first the drawings and using highlighter, would highlight structural sizes according to their sizes using different colors. In that manner, you will have an overall view of changes of structural sizes in the drawing.
Minutes of the Meeting
As a designer coordinating with client and contractor, one should learn how to take minutes of the meeting even for personal use. But most of the time, as a representative of company you are working in, you should take down notes during meeting so that your Project Manager will learn the discussion even hes's not around.
The following tips may be useful:
1. Make sure to read the agenda of the meeting before it starts then ready yourself on all possible question the contractor or client may ask in the meeting related to the agenda.
2. since you may not be aware for all the item listed, forward the agenda to concerned discipline lead for them to answer the agenda or update you with the latest information.
3. Learn to anticipate. One agenda may affect other agenda or other issue on the project. Brainstorm in your head possible scenarios for each answer to agenda.
Subscribe to:
Posts (Atom)